Hot weather and Wall Fixings

This may not be what it seems but …. for over two years I have had two shelf supports fastened to the workshop wall with screws and plastic wall plugs.   The load on the shelf has barely changed over this period.

The other night while relaxing on the terrace we heard a very loud crash and on investigation found the shelf, contents and both brackets in a heap on the workshop floor.   Fortunately no major damage ensued to anything.

On investigating further I noticed that the blocks used for the wall material was warm to the touch.   This is a consequence of the extraordinary long period of very hot weather we have experience in the UK.   The plugs had come out of the holes intact with the screws still in place.

So my thought is that the warmth in the wall has somehow changed the characteristics of the grip in the wall.   This could be the plug plastic degrading in some way i.e. going soft and having less grip, or maybe the hole in the block work has expanded in diameter enough to lose the grip on the plugs.  Either way it suggests my civil engineering was marginal in the first place !

The shelf is now back up with an extra set of fixing holes and some seriously larger screws.

Similar or related subjects : –

France Visit – Managing Expectations and Martel Railway

It has been a bit quiet due to a visit to France.  As ever France continues to be a contradiction to me.

We are having some work done on the house – a terrace and balcony on the rear of the property and a new wall bordering the driveway to define the terrain.   This has been ongoing for nearly a year since first discussed and agreed with the builder.  There is always a reason why the project is delayed be it weather, subcontractors etc.   Like many other similar encounters there is no communication either positive or negative to let you know what is going on.   You arrive expecting to see something as promised and it is not done.   It results in a confrontation, a shrug of shoulders and ‘tomorrow’ (Demain).   I used to think Peter Mayle was joking in his book ‘A Year in Provence’ but now I am not so sure.

I can’t help but contrast this with when I was in business when I always stressed to my team that they must manage the client expectations.   If the job was going to be late tell the client early on so there are no surprises.   If you are going to delivery before expected then also tell them so they think you are wonderful.  This clearly does not fit with the French psych.   That having been said they are nice people and we have some great times out there.

Anyway the light is at the end of the tunnel and the work they have done looks excellent and very well engineered.   It has just taken a very very long time …..

Martel Steam Railway

Speaking of tunnels we had a friend staying and we visited the Martel Steam Railway for a steam train ride.   The Martel line is a few miles long and has a very steep gradient from the village of Martel down to the valley side overlooking the Dordogne.  The society runs both steam and diesel engines and the carriages are really just open trucks with a roof over them.   It was busy and it was hot (mid 30s).   We had the added pleasure of a brass band on the journey playing ‘umpahpah’ music.

View from the trackside over the Dordogne Valley

There is a lot of history regarding the line.  For a steam engine the gradient is very steep and the engineering of the line involved a number of tunnels of varying length.  During WW2 the line had to be pressed into service for all mainline traffic following resistance action on other routes.  If you are in the area it is worth a  visit.

Martel Steam Engine in the Dordogne

http://trainduhautquercy.info/en/steam-train-martel-le-truffadou/

Similar or related subjects : –

IT issues in France – Google Backup and Sync + Port 25

As you might have guessed from the above we are in France and the weather is somewhat hot being in the late 30s centigrade.   It is too hot to sit outside so I am inside playing IT.

For the past three visits I have seen an issue with my desktop having long and erratic ping times and download speeds as tested with Okla speedtest.   I have had support visits from the service providers and still no joy.

I brought out my new XPS13 and discovered that if the resident desktop machine is not online everything is normal for all connected devices (25ms ping and 8Mbps download) (That is fast for rural France …).  If I boot the desktop everything goes very pear shaped.

Huge frustration to say the least with all sorts of things on the desktop being checked and services stopped etc to no avail.

I noticed last night that when ever I turned the desktop off, the shut down process was held pending Backup and Sync closing down.   A search today revealed that Google Backup and Sync is a connection killer.   While I wasn’t really aware I had every loaded it in the first place, I certainly know now that I have unloaded it.   Normal service resumed.  Magic.

The other issue that has arisen which I had forgotten about is that in France the use of Port 25 on POP connections is regarded as spam by France Telecom.  The XPS was not sending messages due to being set to  25 and it now is set to 587 outgoing (110 incoming).

So a useful hour (or two) spent inside from the heat has got me two ticks on the problems to be solved list.

Time for a Pimms and lemonade to celebrate.

Similar or related subjects : –

 

Current Status and Cross Fertilisation of Assets

Not getting a lot done in the workshop at the moment.   Major distraction with the soccer World Cup (we dare to dream …) plus some garden engineering projects have kept me away from things.

It’s great how workshop resources have a significant use and payback when doing other activity.   We had to stake some sleepers (not sure if this is a universal name – the wooden beams used to lay railway steels on) in a new feature in the garden and these needed staking together with through rods.

The Kennedy hacksaw came into play to cut the rods to length and the bench grinder to sharpen the ends to penetrate the soil.    The SDS drill was indispensable to cut the holes in the sleepers etc etc.    All of which justifies the acquired assets to the lady of the house so some points scored.

I also want to install a new desk in the office in our house in France.  The current one is running out of space for the IT router, switch, CCTV DVR, ham radio transceiver, computer etc etc.  I debated buying the materials to make a desk but then looked on EBay and found a complete desk for GBP10 in easy pick up distance.   While picking it up the seller had a drawer unit in poor condition that she threw in for free.   After a day’s remedial work I have a good looking desk with some new chrome handles that were on offer at the local DIY store.   Total material cost under GBP15 which can’t be bad.  I just have to transport it to France on the next run along with all the other items currently stacked up ready to go.  The car could be low on the suspension.

Similar or related subjects : –

SDS Rotary Hammer Drill

Some time ago I saw an advert offering a big discount on a SDS Rotary Hammer drill from a local tool store.   I had no idea what a SDS drill was but one of my associates convinced me it was a good deal and worth getting.  Looking like a weapon out of Star Wars, it has since sat under the bench in its carrying case and never used …. until today …..

SDS Rotary Hammer Drill

I had to fasten a new garden hose to the external wall through an outer cement facing and into brick.   Normally if I can see the mortar between the bricks I cheat and fasten into the mortar.   Today however I could not see what was behind the facing cement and the hammer setting on my normal hand drill was making no impression.   Light bulb moment …. let’s try out that SDS.

The wall could have been made of cheese such was the speed that the holes were cut.  Lovely machine.  If you haven’t got one – get yourself a SDS !

Similar or related subjects : –

Verified by ExactMetrics